当前位置:首页 > 行业动态 > First tidal 正文

First tidal

来源:凌凌漆影视网页版   作者:新闻中心   时间:2024-09-22 00:56:29

Nova Innovation has announced the installation of the first electric vehicle charge point powered by tidal energy, which is located on the island of Yell in the Shetlands.

The evolt charge point has been installed at Cullivoe harbor by the shores of Bluemull Sound, a strait between the northern Shetland islands of Unst and Yell. It's being operated by ChargePlace Scotland, the national EV charging network owned and operated by the Scottish Government.

"Tidal turbines in the Shetland Tidal Array supply the energy that is converted into electricity for the charge point," the company told New Atlas. "Each 100-kW turbine could provide enough electricity to charge two 50-kWh battery Teslas in an hour."

Nova Innovation's tidal turbines have been providing Shetland homes and businesses with electricity for more than five years. The first 30-kW turbine installed in Bluemull Sound became operational in April 2014. This was decommissioned two years later and replaced by a 100-kW tidal turbine, which was connected to the local grid in August 2016.

标签:

责任编辑:新闻中心